Own a CFPL Supported Service Centre
Start a certified precision-cleaning business for the small engineering units in your industrial cluster — with a CFPL machine, turnkey support and a bank-ready Detailed Project Report.

How a CFPL Supported Service Centre works
From collecting dirty parts to delivering them cleaned, tested, certified and packed — in a compact gala in your own industrial estate.
Register your interest
A problem every small supplier has today
- OEMs and Tier-1 suppliers now reject parts that fail measured cleanliness limits under VDA 19 and ISO 16232.
- Small units still clean by hand — hot tanks, brushes and air guns — and cannot certify their parts.
- A ₹40–50 lakh machine and laboratory makes no sense for one small unit's volume.
- They lose money on rejections, floor space and labour — and miss export and Tier-1 business.
Your centre solves it for all of them — automotive, EV, electrical, hydraulics, pumps and valves, bearings, railways, defence and aerospace, and medical-device suppliers.
A complete service, not just a wash
Collect
Your tempo picks up dirty parts
Clean
CFPL machine cleans to a recipe
Test
Every lot tested to VDA 19
Pack
Corrosion-protected clean packing
Certify
Cleanliness certificate per lot
Deliver
Back to the unit or direct to the OEM



They pay about what they spend today
Your cleaning charge is close to a small unit's own manual cost — and far below what manual cleaning really costs it once rejections, space and compliance are counted.
Per kg of components, Year 1. All-in charge includes pickup and delivery, clean packing and the cleanliness certificate.
What the unit gains
- Rejections cut from about 2% to 0.5%
- 400–800 sq ft freed for machining
- The certificate its OEM asks for — and access to export programmes
- No tanks, no oily effluent, no capital
saved a year by a unit cleaning 750 kg a day, after paying all your charges
What it takes — and what it earns
₹130 lakh project
Machine, laboratory, utilities, effluent treatment, tempo, premises works, pre-operative costs and working capital
₹97 lakh bank loan
Collateral-free under CGTMSE — 75% of the project
₹33 lakh from you
Your contribution — 25%. You run the centre as its CEO.
1,800 sq ft gala
In an industrial estate — no big factory needed. Seven months to start.
Indicative figures from CFPL's model Detailed Project Report. Your own DPR will be prepared for your location and customers.
A machine for every industry need
Eight machine classes and 29 configurations on one engineering core — chosen to suit your cluster's parts, volumes and cleanliness specification.
Single-chamber multi-process
Mixed parts, small and medium batches — the standard centre machine
Multi-chamber
Higher volumes of similar parts
Tunnel and conveyor washers
Continuous high-volume lines
Rotary indexing
High-volume small parts
Solvent under vacuum
Oil- or water-sensitive parts, with solvent recovery
Surface activation
Parts to be bonded, coated or painted
One partner, start to finish
- Machine supply
- Installation at your site
- Testing at site on your customers' own parts
- Training of you and your staff
- One-year maintenance guarantee
- Five-year AMC at 8% of machine cost a year (spares extra, at cost)
Easy payment terms
Advantages of being a CFPL Supported Service Centre
Chemicals at lower prices, assured quality
Bought together from approved makers and matched to the machine and recipes
A trained army of workers
CFPL-trained operators and technicians, productive from day one
Customers looking for suppliers
OEMs and Tier-1s seeking certified ancillary units — their growth brings you more work
Also: proven recipes from other centres · backup during breakdown · overflow and special processes · faster maintenance · trusted certificates · easier bank appraisal
From registration to your first customer
Register with CFPL
Tell us your cluster and plans
Receive your DPR
A bank-ready Detailed Project Report for your centre, provided on registration
Site and customers
Locate the gala; sign up the first customers
Documentation and loan
Professional services arranged at your option — fees paid by you separately
Start your centre
CFPL installs, tests and trains; you start serving customers
Why a CFPL Supported Service Centre
Ready market
13.7 lakh MSMEs; you need only 11 customers
Fair price
₹5.25/kg cleaning — close to manual cost
Certified output
VDA 19 / ISO 16232 certificate with every lot
Collateral-free loan
75% under CGTMSE; you bring 25%
Strong returns
24% IRR · 4.6-year payback
Machine to suit you
Eight classes, 29 configurations
Turnkey by CFPL
Install, test, train, guarantee, AMC
DPR on registration
Bank-ready report; loan help optional
Assured chemicals
Lower prices, tested quality
Trained workers
CFPL-trained, productive from day one
OEM connections
Buyers looking for certified suppliers
Small, simple set-up
1,800 sq ft gala · 7 months to start
Get the Detailed Project Report for your centre
Register your interest and our team will contact you with the DPR for your location and the next steps. There is no obligation.
- DPR on registration
- Guidance on site, customers and the right machine
- Optional professional help with documentation and the bank loan — fees paid by you
Frequently asked questions
Do I need engineering experience?
It helps, but it is not essential. CFPL trains you and your staff on the machine, the chemistry and cleanliness testing before the centre starts.
How much do I need to invest myself?
About 25% of the project cost — around ₹33 lakh on the model project. The rest can be a collateral-free term loan under the CGTMSE scheme, subject to the bank's appraisal.
What does the Detailed Project Report cover?
Market, customers, premises, machinery, project cost, means of finance, loan request under CGTMSE, seven-year financial projections, DSCR, break-even, ratios and employment — prepared for your location.
Will CFPL handle the bank loan for me?
At your option, CFPL arranges professional services for documentation and the bank loan. The professionals' fees are paid by you separately.
How many customers do I need?
About six units cleaning 750 kg a day in the first year and about eleven at full planned utilisation. We advise collecting letters of intent before the loan is applied for.
Which machine will I get?
The machine is chosen to suit your cluster's parts and volumes — usually the single-chamber multi-process machine, with other CFPL machine classes available as your centre grows.